Get Quote
730 people are quoting
X

Steel Structure Workshop Factory

11 month ago
35 0
Product details
Construction steps and procedures for steel structures:
 
Pre construction preparation (sampling and testing of new and old steel, determining the materials and welding rods, connecting bolt models for purchasing new steel) → determining the construction plan and technical disclosure → construction preparation (confirmation of drawings; verification of on-site steel, welding rods, connecting bolts, etc.);
 
Determine the process procedures; Determine the prefabricated production site; Determine the production organization method;
 
Determine production plan; Prepare all construction equipment, tools, protective equipment, etc. → Prefabricate and process reinforcement, added new members and node plates, components, etc. → Assemble new members and node plates on the ground → Erect work scaffolding → Sandblasting and rust removal, remove all corrosive oxide layers and slag covering the surface of the old steel structure → Measure various dimensional data and correct deformation of the old steel structure → Erect unloading support steel frame facilities and remove loads from the steel structure at the working surface → Connect reinforcement and newly added members to the original old steel structure by welding (or bolt connection) at high altitude → Correct the connected members → Remove unloading support steel frame facilities → Check, accept and measure relevant data → Repair and paint Painting work → comprehensive inspection and acceptance, expert evaluation → dismantling of scaffolding for work.

DSC7342
Contact Now

If you are interested in the product, contact 2bvideo.com for more information for more information

To:
Guangdong Tianchen Steel Structure Engineering Co. Ltd.
Message:
Submit
Disclaimer:

The information of 2bvideo.com limited shown above is provided by the user or collected on the network. Video 2B does not guarantee the authenticity,accuracy and legitimacy of 2bvideo.com limited information. Video 2B does not involve legal relationships and disputes between users arising from transactions other than secured transactions on this website. Disputes shall be settled by you through negotiation. If you are the person in charge or relevant employee of this enterprise, if you find that the enterprise information is incorrect or want to manage thiscompany, please contact us jacklee1558@gmail.com, after you claim the enterprise, you can obtain management permission, publish supplyand demand information, bring consulting orders, and remove page advertisements.

Audited supplier
2 year
Address: Dongguan, China


Main Product: Structural Steel Fabrication, Structural Steel, Structural Metal Fabrication, Steel Structure Building, Custom Metal Buildings , Factory Steel Buildings

Disclaimer:
The information of 2bvideo.com limited shown above is provided by the user or collected on the network. Video 2B does not guarantee the authenticity,accuracy and legitimacy of 2bvideo.com limited information. Video 2B does not involve legal relationships and disputes between users arising from transactions other than secured transactions on this website. Disputes shall be settled by you through negotiation. If you are the person in charge or relevant employee of this enterprise, if you find that the enterprise information is incorrect or want to manage thiscompany, please contact us jacklee1558@gmail.com, after you claim the enterprise, you can obtain management permission, publish supplyand demand information, bring consulting orders, and remove page advertisements.
Content Us