
Square tubes is a form of tube type, people have a different name on it, called the rectangular tubes, rectangular tubes, square tubes, welded square tube, because it has a lot of kinds of material of material can make the tube body, usually square tube is formed after unpacking, kaiping, bending strip welding pipe, again by the mechanism of rolling into a square tube.
Carbon square steel pipe, rectangular steel pipe, steel hollow section, divided according to the shape of the section, is a name for square pipe and rectangular pipe. It is made of strip steel that has been processed and rolled. Generally, the strip is unpacked, flattened, coiled, welded to form a round tube, and then rolled into a square tube from the round tube and then cut to the required length. Square rectangular tube is also called cold-formed hollow section steel, referred to as square tube and rectangular tube.
Product Specification
Product Name |
Carbon Steel Square Pipe; Carbon Steel Square Tube |
Standard |
GB5310-2009, GB3087-2008, GB6479-2013, GB9948-2013, GB/T8163-2008, GB8162-2008, GB/T17396-2009 |
Outer Diamater |
1) Round Pipe: 8mm - 680 mm |
Wall-Thickness |
0.5mm-100mm or Customized |
Length |
1m, 1.8m, 2m, 3m, 4m, 5m, 5.8m, 6m, 9m, 10m, 11.8m, 12m or Customized |
Square Pipe Size |
16×16×0.4~1.5; 18×18×0.4~1.5; 20×20×0.4~1.5; 25×25×0.6~2.0; 30×30×0.6~4.0; 34×34×1.0~2.0; 35×35×1.0~4.0; 38×38×1.0~4.0; 40×40×1.0~4.5; 44×44×1.0~4.5; 45×45×1.0~5.0; 50×50×1.0~5.0; 60×60×1.5~5.0; 70×70×2.0~6.0; 75×75×2.0~6.0; 80×80×2.0~6.0; 85×85×2.0~6.0; 95×95×2.0~8.0; 100×100×2.0~8.0; 120×120×4.0~8.0; 150×150×6.0~10.0; 180×180×6.0~12.0; 200×200×6.0~30.0; 220×220×6.0~30.0; 250×250×6.0~30.0; 280×280×6.0~30.0; 300×300×8.0~30.0; 320×320×8.0~30.0; 350×350×8.0~30.0; 380×380×8.0~30.0; 400×400×8.0~30.0; 420×420×10.0~30.0; 450×450×10.0~30.0; 480×480×10.0~30.0; 500×500×10.0~30.0 |
Rectangular Tube Size |
10×20×0.6~1.5 ; 14×21×0.6~1.5 ; 15×30×1.5~1.5 ; 15×38×0.6~1.5 ; 20×30×0.6~2.0 ; 20×40×0.8~2.0 ; 20×50×1.0~2.0 ; 22×35×0.9~2.0 ; 25×40×0.9~3.75 ; 25×65×1.0~2.0 ; 30×40×1.0~3.75 ; 30×45×1.0~3.75 ; 30×50×1.0~4.0 ; 30×60×1.0~4.5 ; 40×50×1.0~4.5 ; 40×60×1.0~5.0 ; 40×80×1.5~5.0 ; 40×100×2.0~5.0 ; 50×60×2.0~5.0 ; 50×80×2.0~5.0 ; 50×100×2.0~8.0 ; 60×80×2.0~6.0 ; 80×100×2.0~8.0 ; 120×60×2.5~10.0 ; 120×80×2.5~10.0 ; 150×100×2.5~12.0 ; 180×150×2.5~12.0 ; 200×100×4~12.0 ; 200×150×4~12.0 ; 250×150×6~12.0 ; 250×100×6~12.0 ; 250×200×6~30.0 ; 300×150×6~30.0 ; 300×200×6~30.0 ; 300×250×6~30.0 ; 400×250×8~30.0 ; 400×300×8~30.0 ; 450×200×8~30.0 ; 450×250×8~30.0 ; 400×300×8~30.0 ; 400×350×8~30.0 ; 500×200×10~30.0 ; 500×250×10~30.0 ; 500×300×10~30.0 ; 500×350×10~30.0 ; 500×400×10~30.0 ; 500×450×10~30.0 |
Surface |
Galvanized, PVC, Black-Painting, Color-Painting, Transparent-Oil, Anti-Rust-Oil, Black-Varnish, 2PE, 3PE, Epoxy-Coating, BE, PE |
Technique |
Hot Rolled, Cold Drawn, Forging, Seamless or Welded |
Shape |
Round, Square, Oval, Rectangular, Welded, Elliptical, Triangular, Hexagonal, Octagonal, Irregular, Special Shapes or Customized |
Pipe Ends |
1) Plain |
Deep Processing |
Oiled, Painted, Galvanized, Powder Coating, Shrink Head, Pressure Groove, Welding Head, Punching, Threaded With Coupling and Plastic Cap |
Material-1 |
ASTM: A105, A106, A106B, A106C, A178, A179, A192, A210, A213, A249, A268, A269, A270, A312, A333, A335, A358, A409, A511, A519, A53, A53A, A53B, A554, A778, A790, A928, B338, B673, B674, B675, B676, B677, B690, 370WP91, WP1, WP2, Gr.B, API5L |
Material-2 |
16Mn, 19Mn5, 20Cr, 40Cr, 20Mn2, Cr5Mo, 12CrMo, 15CrMo, 20CrMo, 28CrMo, 30CrMo, 35CrMo, 42CrMo, 12Cr1MoV, Cr5Mo, 30CMo, 20MnG, 25MnG, 15CrMoG, 12Cr1MoVG, 10CRM0910, 20CrMnTi, 40MnMoV, ZF6, 16MnCr5, 20MnCr5, 38Mn2V, 09CrCuSb(ND), 27SiMn, SS400 |
Application |
1) Pipeline Transport, Boiler Pipe, Hydraulic/Automobile Pipe, Oil/Gas Drilling, Food/Beverage/Dairy Products, Machinery Industry, Chemical Industry, Mining, Construction Decoration, Special Purpose |
Package |
Packed in bundles with 6-8 pcs steel strips, and wrapped with waterproof cloth |
Lead Time |
Delivery of spot products within 2-3 days after receiving the deposit |
Payment Terms |
30% T/T in advance, 70% T/T 70% L/C at sight balance before shipment |
Tips |
Specific requirement of alloy grade, temper or specification can be discussed at your request |
Packaging And Transportation
1) Packaging: 3 layers of packing. Inside is craft paper, Middle is water plastic film and outside GI steel sheet to be covered by steel strips with lock, with inner coil sleeve or as customers' requirements.
2) Shipping: We have long-term cooperation with many experienced shipping companies and will find the most suitable mode of transportation for you.
3) Trade terms: FOB/CIF/CFR
4) Shipping port: Qingdao/Tianjin/Shanghai
5) Shipment: A: Length: ≤6m, loaded in 20GP Container. B: Length: ≤12m, loaded in 40GP Container.
Remark: Size of 20GP Container (inside :5898*2352*2393mm); Size of 40GP Container (inside:12032*2352*2393mm); Size of 40HQ Container (inside:12032*2352*2698mm).
6) Delivery time: Normal size: 7-15days send from warehouse directly. Special size:15-30days custom made for you.
If you are interested in the product, contact 2bvideo.com for more information for more information
The information of 2bvideo.com limited shown above is provided by the user or collected on the network. Video 2B does not guarantee the authenticity,accuracy and legitimacy of 2bvideo.com limited information. Video 2B does not involve legal relationships and disputes between users arising from transactions other than secured transactions on this website. Disputes shall be settled by you through negotiation. If you are the person in charge or relevant employee of this enterprise, if you find that the enterprise information is incorrect or want to manage thiscompany, please contact us jacklee1558@gmail.com, after you claim the enterprise, you can obtain management permission, publish supplyand demand information, bring consulting orders, and remove page advertisements.
Main Product:
Carbon Steel Pipe,
Galvanized Steel Pipe,
Seamless Steel Pipe,
Square Steel Pipe,
Steel Section ,
Galvanized Iron Wire